Close Menu
    Facebook X (Twitter) Instagram
    Facebook X (Twitter) Instagram
    KahawatunguKahawatungu
    Button
    • NEWS
    • BUSINESS
    • KNOW YOUR CELEBRITY
    • POLITICS
    • TECHNOLOGY
    • SPORTS
    • HOW-TO
    • WORLD NEWS
    KahawatunguKahawatungu
    NEWS

    What Caused Closure of JKIA Runway for Hours

    KahawaTungu ReporterBy KahawaTungu ReporterJune 11, 2024No Comments2 Mins Read
    Facebook Twitter WhatsApp Telegram Email
    Share
    Facebook Twitter WhatsApp Telegram Pinterest Email Copy Link

    Officials Tuesday June 11 explained what caused the closure of Jomo Kenyatta International Airport for hours disrupting operations at large.

    The airport operations were affected for two hours as staff rushed to remove a Kenya Airways flight that was stuck on the runway.

    Kenya Airways said their operations control team received a report from the Sharjah Airport Authorities that there was tyre debris on the runway suspected to be from one of our aircraft, a Boeing 737 Freighter, on a routine operation from Sharjah to Juba.

    “Upon receiving this report, our operations control team diverted the aircraft to Nairobi instead of proceeding to Juba.”

    “Upon arrival in Nairobi, the aircraft did an over flight, and our team ascertained that the aircraft had adequate wheels for a safe landing as only one out of six wheels was damaged,” the airline said.

    It added the aircraft touched down safely at 12:55 p.m. local time, but while breaking and slowing down, one of the other tyres failed, which made the aircraft immobilized on the runway.

    The statement added Kenya Airways, in close collaboration with the airport authority and regulator Kenya Civil Aviation Authority (KCAA), diligently worked to replace the tyres and tow the aircraft to safety.

    The aircraft was successfully towed from the runway at 2:12 p.m.

    Kenya Airports Authority said no injuries were reported in the drama.

    When an airport runway is closed, flights might be delayed, rerouted, or cancelled, depending on the severity and duration of the closure.

    Air traffic controllers work to manage the situation and minimise disruptions.

    Email your news TIPS to Editor@Kahawatungu.com — this is our only official communication channel

    JKIA JKIA Runway
    Follow on Facebook Follow on X (Twitter)
    Share. Facebook Twitter WhatsApp LinkedIn Telegram Email
    KahawaTungu Reporter
    • Website

    Email: Editor@Kahawatungu.com

    Related Posts

    Details of those arrested over illegal issuance of vital documents revealed

    December 7, 2025

    Ministry dispels data breach claims in new Kenya-US health deal

    December 7, 2025

    Probe as decomposed body of man is found in River Nzoia after suspected drowning

    December 7, 2025

    Comments are closed.

    Latest Posts

    Briton Norris wins his first F1 title in Abu Dhabi Grand Prix

    December 7, 2025

    Details of those arrested over illegal issuance of vital documents revealed

    December 7, 2025

    British photographer Martin Parr dies aged 73

    December 7, 2025

    Man found dead inside church toilet in Kisii

    December 7, 2025

    Covid fraud and error cost taxpayers £10.9bn, report will say

    December 7, 2025

    Ministry dispels data breach claims in new Kenya-US health deal

    December 7, 2025

    Top Analytics Tools You’ll Learn in a Business Analytics Course

    December 7, 2025

    Benin coup attempt foiled by loyalist troops, interior minister says

    December 7, 2025
    Facebook X (Twitter) Instagram Pinterest
    © 2025 Kahawatungu.com. Designed by Okii.

    Type above and press Enter to search. Press Esc to cancel.