Close Menu
    Facebook X (Twitter) Instagram
    Facebook X (Twitter) Instagram
    KahawatunguKahawatungu
    Button
    • NEWS
    • BUSINESS
    • KNOW YOUR CELEBRITY
    • POLITICS
    • TECHNOLOGY
    • SPORTS
    • HOW-TO
    • WORLD NEWS
    KahawatunguKahawatungu
    NEWS

    KeNHA Explains Cause of Monday’s Huge Traffic Snarl-up on Mombasa Road

    Wycliffe NyamasegeBy Wycliffe NyamasegeOctober 18, 2021Updated:October 18, 2021No Comments2 Mins Read
    Facebook Twitter WhatsApp Telegram Email
    Share
    Facebook Twitter WhatsApp Telegram Pinterest Email Copy Link

    On Monday morning, motorists plying the busy Mombasa Road experienced a huge traffic snarl-up that left many stuck on the road for hours.

    The traffic jam affected the stretch between General Motors and the Jomo Kenyatta International Airport (JKIA).

    Avoid Mombasa Road,Heavy traffic caused by diversion at GM as they are dismantling the foot bridge..
    Find alternative routes. pic.twitter.com/eBMjRJxz4s

    — Man United Boy (@engi_BoobyKipro) October 18, 2021

    In a statement hours later, the Kenya National Highways Authority (KeNHA) disclosed that the congestion was a result of a temporary breakdown of a crane that was demolishing a bridge in the area.

    “KeNHA wishes to advise motorists of a traffic snarl-up from GM area which has caused congestion of traffic flow for traffic plying towards Imara Daima and its environs.

    “A temporary breakdown of a crane that was earlier at the site caused traffic build-up. Work is, however, underway by the project implementation team to clear the site and resume normal traffic flow. KeNHA apologises for any inconveniences caused,” KeNHA explained.

    Traffic Advisory: Snarl up at GM along Mombasa Road pic.twitter.com/5cQJJfmS4v

    — Kenya National Highways Authority (KeNHA) (@KeNHAKenya) October 18, 2021

    The ongoing construction of the Express Way has over the last few months affected traffic flow on the busy road with Kenyans urging the government to expedite the works.

    Read: Estates Along Mombasa Road to Experience Dry Taps Due to Expressway Works

    The 27km Nairobi Expressway, which is set to be completed by 2022, is expected to ease traffic jams on Mombasa Road.

    The project is being undertaken by China Road and Bridge Corporation (CRBC) on a public-private partnership (PPP) basis.

    Email your news TIPS to Editor@kahawatungu.com or WhatsApp +254707482874. You can also find us on Telegram through www.t.me/kahawatungu 

    Email your news TIPS to Editor@Kahawatungu.com — this is our only official communication channel

    Mombasa Road
    Follow on Facebook Follow on X (Twitter)
    Share. Facebook Twitter WhatsApp LinkedIn Telegram Email
    Wycliffe Nyamasege

    Email news@localhost

    Related Posts

    GDC Advertises CEO Position

    May 26, 2026

    Witness denies bible oath in Mackenzie terrorism case

    May 25, 2026

    Uhuru: Kenya is flirting with 2007 mistakes, tells leaders to stop ‘politics of division’

    May 25, 2026

    Comments are closed.

    Latest Posts

    GSU to Auction Vehicles, Store Items on June 10

    May 26, 2026

    GDC Advertises CEO Position

    May 26, 2026

    US military says it has launched new strikes on southern Iran

    May 26, 2026

    Ferrari unveils first fully electric car

    May 26, 2026

    Pope Leo says AI must be ‘disarmed’ in first major teaching

    May 26, 2026

    Who is Senegal’s New Prime Minister Ahmadou Al Aminou Lo?

    May 26, 2026

    Witness denies bible oath in Mackenzie terrorism case

    May 25, 2026

    Uhuru: Kenya is flirting with 2007 mistakes, tells leaders to stop ‘politics of division’

    May 25, 2026
    Facebook X (Twitter) Instagram Pinterest
    © 2026 Kahawatungu.com. Designed by Okii.

    Type above and press Enter to search. Press Esc to cancel.