Close Menu
    Facebook X (Twitter) Instagram
    Facebook X (Twitter) Instagram
    KahawatunguKahawatungu
    Button
    • NEWS
    • BUSINESS
    • KNOW YOUR CELEBRITY
    • POLITICS
    • TECHNOLOGY
    • SPORTS
    • HOW-TO
    • WORLD NEWS
    KahawatunguKahawatungu
    NEWS

    KeNHA Explains Traffic Disruption Along Mombasa Road

    Mercy AumaBy Mercy AumaMay 18, 2021No Comments2 Mins Read
    Facebook Twitter WhatsApp Telegram Email
    Share
    Facebook Twitter WhatsApp Telegram Pinterest Email Copy Link

    The Kenya National Highway Authority (KeNHA) has explained traffic disruption along Mombasa Road linking it to the construction of the Nairobi Expressway.

    Through a statement, the authority indicated that the situation has been worsened by the heavy rains witnessed across the country.

    Apparently, the heavy rains interfered with drainage systems leading to flooding in different locations hence leading to traffic.

    “The disruption to traffic on the A8 Road within the section from Mlolongo to James Gichuru has been occasioned by the ongoing construction of the Expressway within the central median and associated relocation of utilities such as water and sewer pipes, power lines and ICT fibre cables,” the statement reads in part.

    Read: Transport Paralyzed As Oria-Riat Bridge Along Migori-Homa Bay Road Collapses

    Last week, transport along the Migori-Homa Bay road was paralyzed after the Oria-Riat bridge collapsed.

    In yet another account of events, KeNHA alerted motorists that the Dhogoye Bridge along the Bondo-Usenge road had collapsed due to heavy rains experienced in the region.

    The authority urged motorists to be patient as plans to have the bridge repaired were underway.

    “Since there is no alternative access to Osieko, we wish to advise motorists along that section not to attempt crossing the over-topped section, and to only cross when water levels are low,” the statement by KeNHA read.

    Heavy rains have been experienced in different parts of the country for the last couple of days with the Kenya Met warning that the downpour might continue until the end of May.

    Email your news TIPS to Editor@kahawatungu.com or WhatsApp +254707482874. You can also find us on Telegram through www.t.me/kahawatungu

    Stay connected via Google News
    Follow us for the latest news updates and guides.
    Add as preferred source on Google

    Email your news TIPS to Editor@Kahawatungu.com — this is our only official communication channel

    KeNHA Mombasa Road
    Follow on Facebook Follow on X (Twitter)
    Share. Facebook Twitter WhatsApp LinkedIn Telegram Email
    Mercy Auma
    • X (Twitter)

    Passionate about human interest stories and politics. Email: Editor@Kahawatungu.com

    Related Posts

    84 Kenyans Killed, 54 Missing in Russia-Ukraine War, Mudavadi Says

    October 8, 2026

    Kindiki Vows to Take On Sellers of Harmful Alcohol in War Against Illicit Brews

    October 8, 2026

    Panel Pays Sh83.7 million to 259 Victims of Protest

    October 8, 2026

    Comments are closed.

    Latest Posts

    High Court quashes DPP decision to drop corruption case against CS Oparanya

    October 8, 2026

    National Youth Council Elections Postponed Following Court Order

    October 8, 2026

    Court stops auction of Riverside property over claims of defective execution documents 

    October 8, 2026

    Kisumu court sentences man to life imprisonment for defiling stepdaughter

    October 8, 2026

    Safaricom Unveils SD-WAN Service for Multi-Branch Businesses from Sh9,500

    October 8, 2026

    84 Kenyans Killed, 54 Missing in Russia-Ukraine War, Mudavadi Says

    October 8, 2026

    Kenya to Host WRC Safari Rally in 2027

    October 8, 2026

    How to Avoid Dampness on Walls

    October 8, 2026
    Facebook X (Twitter) Instagram Pinterest
    © 2026 Kahawatungu.com. Designed by Okii.

    Type above and press Enter to search. Press Esc to cancel.