Close Menu
    Facebook X (Twitter) Instagram
    Facebook X (Twitter) Instagram
    KahawatunguKahawatungu
    Button
    • NEWS
    • BUSINESS
    • KNOW YOUR CELEBRITY
    • POLITICS
    • TECHNOLOGY
    • SPORTS
    • HOW-TO
    • WORLD NEWS
    KahawatunguKahawatungu
    BUSINESS

    JKIA Expansion to Cost Sh154 Billion, Says CS Chirchir

    Damaris GatwiriBy Damaris GatwiriJune 19, 2026No Comments2 Mins Read
    Facebook Twitter WhatsApp Telegram Email
    Share
    Facebook Twitter WhatsApp Telegram Pinterest Email Copy Link

    The planned expansion of Jomo Kenyatta International Airport (JKIA) will cost no more than Sh154.2 billion, Transport Cabinet Secretary Davis Chirchir has said, dismissing reports that the project could cost as much as Sh375 billion.

    Speaking on the proposed modernization programme, Chirchir clarified that the government has not signed any contract for the project and remains committed to the approved budget estimates.

    “The government does not anticipate the contract award to exceed Sh154.2 billion, and there is no contract that has been signed,” he said.

    The expansion project is expected to significantly increase JKIA’s capacity, more than doubling annual passenger handling from the current 7.5 million passengers to 22 million by 2029.

    The planned works include the construction of a new passenger terminal, upgrades to existing airport facilities, and the development of a second runway aimed at easing congestion and improving operational efficiency at Kenya’s main aviation hub.

    According to Chirchir, the redesign will enhance passenger movement within the airport and enable JKIA to accommodate growing domestic, regional and international traffic without placing additional strain on existing infrastructure.

    The proposed second runway is also expected to boost aircraft movement capacity, addressing long-standing operational bottlenecks and positioning the airport to handle increased demand in the coming years.

    The latest expansion plan follows the collapse of a proposed public-private partnership with India’s Adani Group, which faced intense public scrutiny, legal challenges and concerns over transparency and the long-term management of the strategic aviation facility.

    Email your news TIPS to Editor@Kahawatungu.com — this is our only official communication channel

    Follow on Facebook Follow on X (Twitter)
    Share. Facebook Twitter WhatsApp LinkedIn Telegram Email
    Damaris Gatwiri

    Damaris Gatwiri is a digital journalist, driven by a profound passion for technology, health, and fashion.

    Related Posts

    TotalEnergies to Invest Over Sh1 Billion Annually to Boost LPG Adoption in Kenya

    June 19, 2026

    Acorn Partners with Banks to Offer Students Housing Loans and Graduate Business Funding

    June 18, 2026

    Treasury Asked to Hire Key Staff to Prevent Groundwater Training Agency Collapse

    June 18, 2026

    Comments are closed.

    Latest Posts

    Senator Seeks Probe Into Kajiado Waste Incineration Facility Over Health, Environmental Concerns

    June 19, 2026

    TotalEnergies to Invest Over Sh1 Billion Annually to Boost LPG Adoption in Kenya

    June 19, 2026

    Woman dies after jumping from seventh floor at Aga Khan Hospital in Nairobi

    June 19, 2026

    Woman arrested over triple murder in Machakos

    June 19, 2026

    Police probe murder after driver’s body found along Nairobi-Garissa highway

    June 19, 2026

    Five club workers arrested over murder of man whose body was found dumped in Machakos

    June 19, 2026

    Coast Water Crisis Worsens as Government Moves to Accelerate Infrastructure Projects

    June 19, 2026

    Probe as body of young girl is recovered from Nairobi River

    June 19, 2026
    Facebook X (Twitter) Instagram Pinterest
    © 2026 Kahawatungu.com. Designed by Okii.

    Type above and press Enter to search. Press Esc to cancel.