Close Menu
    Facebook X (Twitter) Instagram
    Facebook X (Twitter) Instagram
    KahawatunguKahawatungu
    Button
    • NEWS
    • BUSINESS
    • KNOW YOUR CELEBRITY
    • POLITICS
    • TECHNOLOGY
    • SPORTS
    • HOW-TO
    • WORLD NEWS
    KahawatunguKahawatungu
    NEWS

    KeNHA Announces Partial Closure Of Thika–Garissa Road For Three Months

    David WafulaBy David WafulaJuly 22, 2025No Comments2 Mins Read
    Facebook Twitter WhatsApp Telegram Email
    Share
    Facebook Twitter WhatsApp Telegram Pinterest Email Copy Link

    The Kenya National Highways Authority (KeNHA) has announced that part of the busy Thika–Garissa (A3) Road will be partially closed for three months to allow for crucial bridge maintenance works.

    In a public notice issued on Monday, July 21, KeNHA said the closure will affect the section near Mbakini Centre, where maintenance will be carried out on the Kavenge (Mbakini) Bridge. The rehabilitation works are scheduled to begin on Saturday, July 26, 2025, and will continue until Saturday, November 8, 2025.

    The repair project involves the restoration of the bridge’s deck and girders—critical components that support the bridge’s weight and the vehicles that use it. Though not visible to everyday motorists, girders are the main horizontal beams beneath the bridge deck and are essential for the structure’s stability.

    KeNHA has advised motorists using the Thika–Garissa Road to expect slower traffic, possible diversions, and longer travel times during the period. A traffic management plan is currently being developed to reduce congestion and guide road users through alternative routes.

    “To ensure the smooth flow of traffic, police officers and traffic marshals will be deployed along the affected stretch to assist and direct motorists,” the authority said in part of the notice.

    KeNHA has urged all road users to follow instructions on-site and cooperate with officers to ensure their safety and that of the construction team. The installation and replacement of the bridge girders—likely made of steel—will take time, as the process involves removing old parts, conducting repairs, and placing the new components with precision.

    Engineers working on the project say the repairs cannot be rushed, as bridge safety depends heavily on the correct positioning and installation of its structural elements.

    The road section serves as a key transport corridor for motorists and commercial transporters traveling between central Kenya and the eastern region, making the ongoing works crucial for long-term road safety and durability.

     

    Email your news TIPS to Editor@Kahawatungu.com — this is our only official communication channel

    Follow on Facebook Follow on X (Twitter)
    Share. Facebook Twitter WhatsApp LinkedIn Telegram Email
    David Wafula

    Related Posts

    African leaders push to extend threatened AU mission to Somalia

    August 1, 2026

    Kenya makes Sh6.4 million health insurance mandatory for all foreign visitors

    August 1, 2026

    University student found dead in bathroom at Kiambu rental home

    August 1, 2026

    Comments are closed.

    Latest Posts

    Mountaineer Nirmal Purja killed in Pakistan avalanche, his company says

    August 1, 2026

    Battle for State House intensifies as Matiang’i takes 2027 campaign to Migori

    August 1, 2026

    Uefa has ‘lost confidence’ in Infantino’s Fifa leadership

    August 1, 2026

    Spain attacks ‘selfish’ response of some EU countries to Ceuta migrant crossings

    August 1, 2026

    African leaders push to extend threatened AU mission to Somalia

    August 1, 2026

    Kenya makes Sh6.4 million health insurance mandatory for all foreign visitors

    August 1, 2026

    Silver lining: Team Kenya bounces back with double medals

    August 1, 2026

    Dogged by infamy, Kisii’s Green Army wins praise for cleaning up town

    August 1, 2026
    Facebook X (Twitter) Instagram Pinterest
    © 2026 Kahawatungu.com. Designed by Okii.

    Type above and press Enter to search. Press Esc to cancel.