Close Menu
    Facebook X (Twitter) Instagram
    Facebook X (Twitter) Instagram
    KahawatunguKahawatungu
    Button
    • NEWS
    • BUSINESS
    • KNOW YOUR CELEBRITY
    • POLITICS
    • TECHNOLOGY
    • SPORTS
    • HOW-TO
    • WORLD NEWS
    KahawatunguKahawatungu
    NEWS

    Kindiki Gives Update On Sh100 Billion Isiolo–Mandera Highway Project

    David WafulaBy David WafulaMay 27, 2025No Comments2 Mins Read
    Facebook Twitter WhatsApp Telegram Email
    Share
    Facebook Twitter WhatsApp Telegram Pinterest Email Copy Link

    Deputy President Kithure Kindiki has shared an update on the construction of the Sh100 billion Isiolo–Mandera Highway, a major project aimed at opening up northern Kenya for development.

    The 750-kilometre road connects key towns including Isiolo, Kula Mawe, Modogashe, Samatar, Wajir, Tarbaj, Kotulo, Kobo, Elwak, Garre, Rhamu, and Mandera. It has been divided into 11 sections and awarded to seven contractors to ensure timely completion within two years.

    “Pleased to do an impromptu spot check on the progress of the 77-kilometre Kula Mawe–Isiolo section, being built at a cost of Sh8.3 billion,” Kindiki said. “Certainly, a flagship project for Kenya’s transformation is underway.”

    The highway, which links Isiolo, Garissa, Wajir, and Mandera counties, recently attracted national attention during President William Ruto’s tour of the region. In a speech in Isiolo, the President impressed many with his grasp of the project’s route, renewing public interest and hope.

    “Ndio barabara itoke Mandera, ikuje Rhamu, ikuje Garre, ikuje El-Wak, ikuje Kobo, ikuje pale Kotulo, ikuje Tarbat, ipitie hapa Wajir, iende Samatan, iteremke Modogashe, ifike Isiolo, iende Nairobi,” Ruto said.

    The road is part of the larger Isiolo–Mandera Corridor and is expected to boost trade and improve transport between Kenya and neighbouring countries like Somalia and Ethiopia.

    President Ruto reiterated his commitment to the project during a visit on February 19, saying, “I am committed to delivering on the road from Isiolo to Mandera because for a very long time, we have left Northern Kenya behind.”

    One key section, the 140-kilometre Elwak–Rhamu stretch, is being built with support from a Sh27.5 billion ($215 million) loan from the African Development Bank (AfDB). Work on this section had stalled earlier due to security issues but resumed after the government rolled out a security plan.

    Once complete, the highway is expected to cut travel time from 4.7 to 3.2 hours and reduce vehicle operating costs. It is also projected to raise regional trade volumes by 15%, from Sh25.7 billion to Sh29.5 billion annually.

    Defense Cabinet Secretary Aden Duale praised President Ruto’s focus on the region, saying, “Promise made and delivery ongoing. Thank you, Mr. President.”

    The Kenya National Highways Authority (KeNHA) is leading the construction of the highway.

     

    Email your news TIPS to Editor@Kahawatungu.com — this is our only official communication channel

    Follow on Facebook Follow on X (Twitter)
    Share. Facebook Twitter WhatsApp LinkedIn Telegram Email
    David Wafula

    Related Posts

    Cops shoot dead notorious robbery suspect in Kirinyaga

    May 2, 2026

    House help dies after church staircase stampede in Embakasi

    May 2, 2026

    Collapsed wall damages 11 vehicles at Kilimani garage

    May 2, 2026

    Comments are closed.

    Latest Posts

    Safaricom Doubles Home Fibre Speeds to Power Smart Living

    May 2, 2026

    What is Max Weinberg Net Worth and Salary?

    May 2, 2026

    What is Nils Lofgren Net Worth?

    May 2, 2026

    How to Stop Oily Face During the Day

    May 2, 2026

    How to Stop Human Trafficking

    May 2, 2026

    How to Stop Human Rights Violations

    May 2, 2026

    How to Stop Hair Breakage Naturally

    May 2, 2026

    How to Stop Google Photos Backup

    May 2, 2026
    Facebook X (Twitter) Instagram Pinterest
    © 2026 Kahawatungu.com. Designed by Okii.

    Type above and press Enter to search. Press Esc to cancel.