Close Menu
    Facebook X (Twitter) Instagram
    Facebook X (Twitter) Instagram
    KahawatunguKahawatungu
    Button
    • NEWS
    • BUSINESS
    • KNOW YOUR CELEBRITY
    • POLITICS
    • TECHNOLOGY
    • SPORTS
    • HOW-TO
    • WORLD NEWS
    KahawatunguKahawatungu
    NEWS

    What Caused Closure of JKIA Runway for Hours

    KahawaTungu ReporterBy KahawaTungu ReporterJune 11, 2024No Comments2 Mins Read
    Facebook Twitter WhatsApp Telegram Email
    Share
    Facebook Twitter WhatsApp Telegram Pinterest Email Copy Link

    Officials Tuesday June 11 explained what caused the closure of Jomo Kenyatta International Airport for hours disrupting operations at large.

    The airport operations were affected for two hours as staff rushed to remove a Kenya Airways flight that was stuck on the runway.

    Kenya Airways said their operations control team received a report from the Sharjah Airport Authorities that there was tyre debris on the runway suspected to be from one of our aircraft, a Boeing 737 Freighter, on a routine operation from Sharjah to Juba.

    “Upon receiving this report, our operations control team diverted the aircraft to Nairobi instead of proceeding to Juba.”

    “Upon arrival in Nairobi, the aircraft did an over flight, and our team ascertained that the aircraft had adequate wheels for a safe landing as only one out of six wheels was damaged,” the airline said.

    It added the aircraft touched down safely at 12:55 p.m. local time, but while breaking and slowing down, one of the other tyres failed, which made the aircraft immobilized on the runway.

    The statement added Kenya Airways, in close collaboration with the airport authority and regulator Kenya Civil Aviation Authority (KCAA), diligently worked to replace the tyres and tow the aircraft to safety.

    The aircraft was successfully towed from the runway at 2:12 p.m.

    Kenya Airports Authority said no injuries were reported in the drama.

    When an airport runway is closed, flights might be delayed, rerouted, or cancelled, depending on the severity and duration of the closure.

    Air traffic controllers work to manage the situation and minimise disruptions.

    Email your news TIPS to Editor@Kahawatungu.com — this is our only official communication channel

    JKIA JKIA Runway
    Follow on Facebook Follow on X (Twitter)
    Share. Facebook Twitter WhatsApp LinkedIn Telegram Email
    KahawaTungu Reporter
    • Website

    Email: Editor@Kahawatungu.com

    Related Posts

    Former MP Arrested over alleged Sh56 million land fraud

    June 9, 2026

    Gachagua to Appeal High Court Decision Upholding Impeachment

    June 9, 2026

    Murkomen Opens 4th Indo-Pacific Maritime Security Meeting in Mombasa

    June 9, 2026

    Comments are closed.

    Latest Posts

    Former MP Arrested over alleged Sh56 million land fraud

    June 9, 2026

    Bitok Reassigned to Tourism Ministry

    June 9, 2026

    Kindiki Outlines Govt Measures to Address Rising Cases of School Unrest

    June 9, 2026

    Gachagua to Appeal High Court Decision Upholding Impeachment

    June 9, 2026

    Murkomen Opens 4th Indo-Pacific Maritime Security Meeting in Mombasa

    June 9, 2026

    Government Targets Sh1.42 Billion Annually from Reintroduced Tea Export Levy

    June 9, 2026

    Orbelín Pineda Siblings: Getting to Know Onay Pineda

    June 9, 2026

    Brady Tkachuk Siblings: Get to Know Matthew and Taryn Tkachuk

    June 9, 2026
    Facebook X (Twitter) Instagram Pinterest
    © 2026 Kahawatungu.com. Designed by Okii.

    Type above and press Enter to search. Press Esc to cancel.