Close Menu
    Facebook X (Twitter) Instagram
    Facebook X (Twitter) Instagram
    KahawatunguKahawatungu
    Button
    • NEWS
    • BUSINESS
    • KNOW YOUR CELEBRITY
    • POLITICS
    • TECHNOLOGY
    • SPORTS
    • HOW-TO
    • WORLD NEWS
    KahawatunguKahawatungu
    NEWS

    President Kenyatta Orders Cancellation Of Kimwarer Dam Project

    Wycliffe NyamasegeBy Wycliffe NyamasegeSeptember 18, 2019Updated:January 12, 2021No Comments3 Mins Read
    Facebook Twitter WhatsApp Telegram Email
    Share
    Facebook Twitter WhatsApp Telegram Pinterest Email Copy Link

    President Uhuru Kenyatta has ordered immediate cancellation of the Kimwarer Dam Project.

    In a statement on Wednesday, State House Spokesperson Kanze Dena stated that the President gave the directive after the multibillion project was found to be technically and financially not feasible by the project Technical Committee.

    The President, however, directed the immediate commencement of the implementation of the Arror Multipurpose Dam project.

    The president gave the directives after he received a report on the two multi-billion projects located in Elgeyo Marakwet County that saw over 25 individuals including former Treasury Cabinet Secretary and his PS Kamau Thugge charged with graft.

    The three-member committee chaired by Principal Secretary for Infrastructure Prof Paul Maringa found out that no current reliable feasibility study had been conducted on the Kimwarer dam project. Other members in the committee are Quantity Surveyor Julius Matu, Eng Benjamin Mwangi and Eng John Muiruri.

    “The only feasibility study carried out on a similar project twenty-eight (28) years ago had revealed a geological fault across the 800-acre project area, which would have negative structural effects on the proposed dam, ” the statement reads in part.

    Read: Murkomen Is Planning My Impeachment To Silence Me Over Arror-Kimwarer Scandal – Governor Alex Tolgos

    The committee also established that the project area is settled and would require compensation of displaced residents.

    Maringa’s committee, further, stated that the project’s water supply system would require a pumping system which they found out to be unsustainable in terms of operations and maintenance costs.

    “Therefore, the Technical Committee recommended to the President that the Kimwarer Dam project be discontinued, ” said Ms Dena.

    On the other hand, after a thorough review of the Arror dam project, the committee found it to be economically viable.

    However, it noted that it was overpriced and recommended that it’s cost be rationalized.

    Read Also: DP Ruto Should Resign Over His Utterances On Kimwarer Dam Scandal  – MP Mbadi

    “As part of the cost rationalization plan, the Technical Committee has prepared a new Bills of Quantities (BQ) for a modified dam with its height scaled down to 60 metres from the original design height of 96 metres which was found to be unviable, ” the statement reads.

    With the new design components and cost rationalization plan approved by the president, the Arror dam project will require about 250 acres of land and cost Ksh15.4 billion with power and Ksh13.1 billion without power.

    The dam was previously estimated to cost Ksh28.3 billion.

    The president formed the committee following the discovery of irregularities and improprieties surrounding the two infrastructure projects.

    Email your news TIPS to Editor@kahawatungu.com or WhatsApp +254707482874. You can also find us on Telegram through www.t.me/kahawatungu

    Email your news TIPS to Editor@Kahawatungu.com — this is our only official communication channel

    Arror and Kimwarer dam
    Follow on Facebook Follow on X (Twitter)
    Share. Facebook Twitter WhatsApp LinkedIn Telegram Email
    Wycliffe Nyamasege

    Email news@localhost

    Related Posts

    Four people killed, several others injured in road accident in Busia

    December 5, 2025

    DCI Arrests Three Over Sh350 Million Fraudulent Transfer of NSSF Land

    December 5, 2025

    Police Arrest Nine Suspected Gang Members in Kakamega

    December 5, 2025

    Comments are closed.

    Latest Posts

    Four people killed, several others injured in road accident in Busia

    December 5, 2025

    Netflix to buy Warner Bros film and streaming businesses for $72bn

    December 5, 2025

    Sonko gets reprieve as tribunal orders KRA to unfreeze his bank accounts

    December 5, 2025

    Two jailed for 10 years for vandalising electricity equipment in Homa Bay

    December 5, 2025

    Germany votes to bring back voluntary military service programme for 18-year-olds

    December 5, 2025

    Putin says Russia ready to supply ‘uninterrupted’ fuel to India

    December 5, 2025

    DCI Arrests Three Over Sh350 Million Fraudulent Transfer of NSSF Land

    December 5, 2025

    Police Arrest Nine Suspected Gang Members in Kakamega

    December 5, 2025
    Facebook X (Twitter) Instagram Pinterest
    © 2025 Kahawatungu.com. Designed by Okii.

    Type above and press Enter to search. Press Esc to cancel.