Close Menu
    Facebook X (Twitter) Instagram
    Facebook X (Twitter) Instagram
    KahawatunguKahawatungu
    Button
    • NEWS
    • BUSINESS
    • KNOW YOUR CELEBRITY
    • POLITICS
    • TECHNOLOGY
    • SPORTS
    • HOW-TO
    • WORLD NEWS
    KahawatunguKahawatungu
    BUSINESS

    Kenya Building A Ksh540 Billion Nuclear Plant In Tana River

    Francis MuliBy Francis MuliAugust 19, 2020No Comments2 Mins Read
    Facebook Twitter WhatsApp Telegram Email
    Share
    Facebook Twitter WhatsApp Telegram Pinterest Email Copy Link

    The Kenya Nuclear Electricity Board (KNEB) has revealed that the country is building a $5 billion (Ksh540 billion) nuclear power plant in Tana River County.

    This was revealed through filings with the National Environment Management Authority (Nema), showing that the plant can generate 1,000 megawatt (Mw) of power in the initial stages.

    The project will be funded through private investors under a Build Operate Transfer (BOT) agreement, according to KNEB.

    “The financing aspect of the Nuclear Power Plant is among the plans underway with a Build Operate Transfer (BOT) being the most preferred financing agreement with the concessionaire that shall come on board,” KNEB said in its plans.

    Among the notable sponsors-to-be of the plant include China, Russia, South Korea and Slovakia.

    Read: Google to Acquire Substantial Stake in the Lake Turkana Wind Power Project

    KNEB had identified Lake Victoria and Lake Turkana basins as the most appropriate places to set up the plant, but chose Tana River arguing that it is not prone to earthquakes.

    If the project sails through, Kenya will become among the few countries in Africa to have a nuclear plant after South Africa and Egypt.

    Kenya’s geothermal power production is the biggest in the country at 45 per cent followed by hydropower  at 28 per cent. Wind takes 13 per cent while diesel-run generators take 11 per cent according to the Economic Survey.

    The project will outdo the Standard Gauge Railway (SGR) as the most expensive project in the country, and KNEB has asked the government to do away with corruption which could be detrimental to its success.

    “Kenya is at a risk due to the expected investment of Ksh500 billion into the Nuclear Power Plant if the current issues of run-away corruption are not curtailed, which may lead to massive public economic loss due to possible implementation delays and overruns as experienced in other mega projects in the country,” says the agency.

    “The vice has the potential of exposing the country to national safety and security risks.”

    Email your news TIPS to Editor@kahawatungu.com or WhatsApp +254707482874. You can also find us on Telegram through www.t.me/kahawatungu

    Email your news TIPS to Editor@Kahawatungu.com — this is our only official communication channel

    KNEB Tana river
    Follow on Facebook Follow on X (Twitter)
    Share. Facebook Twitter WhatsApp LinkedIn Telegram Email
    Francis Muli
    • Website
    • Facebook
    • X (Twitter)
    • Instagram
    • LinkedIn

    Follow me on Twitter @francismuli_ Email: Editor@Kahawatungu.com

    Related Posts

    Prosecution fights Anglo Leasing case in Court of Appeal

    February 4, 2026

    Banks Propose 5% PAYE Tax Cut to Boost Workers’ Income and Economic Growth

    February 4, 2026

    Illicit Cigarette Trade Costing Kenya Over Sh9 Billion Annually, New Report Shows

    February 4, 2026

    Comments are closed.

    Latest Posts

    Man who tried to shoot Trump at a Florida golf course gets life in prison

    February 5, 2026

    ‘Canada must preserve its independence’, former PM says at portrait unveiling

    February 4, 2026

    Signs of forced entry found at Arizona home of ‘Today’ show host Savannah Guthrie’s mother

    February 4, 2026

    Trump’s border czar says 700 immigration officers to leave Minnesota immediately

    February 4, 2026

    Stephen Miran resigns from the White House, keeping his seat at the Fed

    February 4, 2026

    Washington Post announces widespread layoffs, gutting numerous parts of its newsroom

    February 4, 2026

    Details of Jeffrey Epstein post-mortem released in latest files

    February 4, 2026

    Prosecution fights Anglo Leasing case in Court of Appeal

    February 4, 2026
    Facebook X (Twitter) Instagram Pinterest
    © 2026 Kahawatungu.com. Designed by Okii.

    Type above and press Enter to search. Press Esc to cancel.