Close Menu
    Facebook X (Twitter) Instagram
    Facebook X (Twitter) Instagram
    KahawatunguKahawatungu
    Button
    • NEWS
    • BUSINESS
    • KNOW YOUR CELEBRITY
    • POLITICS
    • TECHNOLOGY
    • SPORTS
    • HOW-TO
    • WORLD NEWS
    KahawatunguKahawatungu
    NEWS

    Engineer Muturi Mugu disputes responsibility for collapsed Eastleigh building

    KahawaTungu ReporterBy KahawaTungu ReporterOctober 25, 2026No Comments3 Mins Read
    Facebook Twitter WhatsApp Telegram Email
    Share
    Facebook Twitter WhatsApp Telegram Pinterest Email Copy Link

    Engineer Joseph Muturi Mugu, identified by the National Construction Authority (NCA) as the structural engineer behind the building that collapsed in Eastleigh, Nairobi, has formally disputed responsibility for the project.

    Through his lawyers, Bedan Njeri & Company Advocates, Mugu said he only prepared structural designs for a proposed 15-storey development and handed them to the developer for submission for approval.

    In a letter addressed to the NCA, the engineer maintains that he never received an approval code for the submitted designs and consequently did not undertake any further professional work on the project.

    He therefore disputed the Authority’s attribution of responsibility to him following the collapse of the building along 9th Street in Eastleigh on Friday, October 23, 2026.

    The NCA had identified Mugu as the structural engineer listed in its records for the development in a press statement dated October 23.

    Through his lawyers, Mugu sought certified copies of the complete project registration application, supporting documents, registration certificate and any subsequent amendments to establish the basis on which his professional details were recorded.

    He also requested all structural drawings, calculations, design reports, county approvals and revised submissions held by the Authority concerning the development.

    The lawyers wanted the NCA to provide every document bearing or purporting to bear Mugu’s signature, stamp, seal or professional registration details.

    They further demanded electronic submission and verification records showing who entered the engineer’s particulars, uploaded the documents and when the submissions were made.

    The requested records include available account identifiers, audit trails, verification messages, approval codes and any documentation indicating that Mugu confirmed or accepted responsibility for the project.

    The legal team also asked the Authority to clarify whether it contacted the engineer to verify his appointment or involvement before registering him against the development or publicly identifying him as the project’s structural engineer.

    If such verification was undertaken, the lawyers wanted copies of the relevant correspondence and records.

    In the letter, the advocates cited Article 35 of the Constitution and Sections 4 and 8 of the Access to Information Act, 2016, saying the disclosure is necessary to establish the accuracy of the Authority’s records, protect their client’s professional reputation and enable him to respond meaningfully to any allegations.

    They also asked the NCA to formally record the engineer’s position in the project file and issue a clarification through the same channels used to circulate its initial statement.

    Given the public circulation of Mugu’s name following the collapse, the lawyers have demanded that the Authority treat the matter as urgent and provide the requested information within 48 hours.

    The building collapse triggered a search and rescue operation amid fears that people had been trapped beneath the rubble.

    Police have launched investigations into the incident. They want to know if all procedures were followed.

    Nairobi Governor Johnson Sakaja said the owners of the building did not have the required paperwork for the building to be occupied.

    He urged the national government to give local authorities greater powers to penalise “developers who disregard approved building plans and safety standards”.

    Building collapses are not uncommon in Nairobi, with poor construction or improper planning often cited as contributing factors.

    The NCA had yet to respond to the engineer’s demands at the time of publication.

    Stay connected via Google News
    Follow us for the latest news updates and guides.
    Add as preferred source on Google

    Email your news TIPS to Editor@Kahawatungu.com — this is our only official communication channel

    Eastleigh Engineer Muturi Mugu
    Follow on Facebook Follow on X (Twitter)
    Share. Facebook Twitter WhatsApp LinkedIn Telegram Email
    KahawaTungu Reporter
    • Website

    Email: Editor@Kahawatungu.com

    Related Posts

    PBORA Opens Online Portal for NGOs to Transition to New PBO Law

    November 23, 2026

    Former North Horr MP Chachu Ganya found alive after disappearance

    November 23, 2026

    EACC faults IEBC over integrity vetting of candidates

    November 23, 2026

    Comments are closed.

    Latest Posts

    Two in murder of KMO Sacco official released on bail by Nairobi court 

    November 23, 2026

    US Army to detonate tonnes of unstable explosives in Iowa despite court order

    November 23, 2026

    Court directs IEBC, Smartmatic to respond to suit on supply of polls technology

    November 23, 2026

    Tarik Skubal agrees to record $450 million contract with New York Mets

    November 23, 2026

    Republican chair of the House Rules Committee loses reelection in Democrats’ largest majority this century

    November 23, 2026

    Iranian attacks in the Strait of Hormuz are at the highest levels since the conflict began

    November 23, 2026

    Nvidia Board Reinstates Jensen Huang As President, CEO

    November 23, 2026

    Fire Breaks Out at Will Smith’s $42 Million California Mansion

    November 23, 2026
    Facebook X (Twitter) Instagram Pinterest
    © 2026 Kahawatungu.com. Designed by Okii.

    Type above and press Enter to search. Press Esc to cancel.